Residential and commercial site plans for building permits
A Site Plans LLC service

How to Get a Site Plan for Your Permit

Start with your address and what you’re building. If the city or county has already sent a checklist or correction notice, include it with your request. We’ll use that information to determine which drawings to quote, what records we still need, and whether the project calls for a survey or professionally signed documents.

RESIDENCESHEDFRONT SETBACKLOT WIDTHNILLUSTRATIVE EXAMPLE
1

Tell us where the work is happening

Enter the full project address and briefly describe the work. An ADU request might say, “New detached unit behind the existing house, with a walkway from the driveway.” A correction request might say, “The reviewer asked us to dimension the existing driveway and revise the coverage table.” Include the agency name, permit number, and filing deadline if known.

2

Send the records you have

Your situationWhat to upload
New project with a surveyComplete survey or plat, proposed layout, and dimensions
New project with a sketchMarked-up plan or property image, basic measurements, and any documents you already have
Signed or sealed plan requestedReviewer’s exact wording, drawings, and any digital submission instructions
Existing application under reviewFull correction notice and the exact version the reviewer saw
Grading or drainage requestedAvailable survey elevations, proposed layout, photographs, and the reviewer’s written request

A request can start with limited records. We’ll identify gaps before drafting and tell you if better boundary data, verified elevations, updated measurements, or another professional service is needed.

3

Review the written quote

Your quote identifies the sheets, the source information we’ll use, the target delivery date, payment milestones, and revision terms. It also states the seal status and identifies any survey, calculations, or supplemental permit sheets that require a separate scope. If the agency uses words such as “certified,” send the full instruction so we can determine what the agency is asking for.

4

Confirm the layout and key dimensions

When a review draft is part of your scope, compare it with your intended placement and confirm what stays, moves, or is removed. Mark your comments on the PDF and send them together. Tell us if your architect, builder, or installer issues a newer drawing so we can coordinate the site layout with the current footprint.

5

Receive your agreed deliverables

We send the agreed drawing files and identify the version intended for submission. When professional sealing is included and the professional completes review, follow the instructions that accompany the issued file. Portal filing and agency coordination are included when specified in the quote. The reviewing agency determines approval.

6

Send review comments if the agency requests changes

Reply with the full notice, marked-up sheets, and resubmittal deadline. We’ll compare the request with your scope, identify the drawings involved, and confirm the next step. See contact us about revisions and refunds.

Two examples of how the process starts

Pool permit

Send the installer’s dimensioned layout and mark the pool, deck and equipment location on the survey.

Site plan resubmittal

Send the reviewed PDF and the city’s full comments, including any markup identifying where dimensions should be added.

Ready to start?

Start with the address, what is changing, and the deadline if you have one. We’ll help you identify the drawing package to request.